PRESS RELEASE 03/2015
ANOTHER SUCCESSFUL YEAR AT ECOBUILD 2015, LONDON
A number of these systems were displayed on our stand so that visitors could easily see where and how the products are installed. In addition we also had live demonstrations on how to install the new ISO-TOP WINFRAMER in front of wall installation system. This makes an airtight structural support to install the windows into the insulation area of the building, in front of the structural wall, supplying a minimum load support of 200 Kg per linear meter of ISO-TOP WINFRAMER. The demonstrations also included how to seal the windows using our all in one ISO-BLOCO ONE multifunction sealing tape. This makes the expansion gap around the window more thermally efficient and acoustically insulated than the window itself, as well as supplying weather resistance to over Hurricane Force.
Both the demonstrations and the exhibits proved to be very popular with our visitors, who kept the stand staff busy. However, if you missed any of this and would like more information on how to get that guaranteed performance between the “as designed” and “as built” performance of your buildings, just contact us.